Home
Migration
Engineering behind data migration

Engineering behind data migration

We are keen on helping you transition from Canny to featureOS in the smoothest way possible. To ensure a smooth transition, we follow these steps during a migration process:

Before:

  1. API key and access control validation

  2. Data validation and sanity check

  3. Test run for migration

During:

  1. Batch import of data from Canny to featureOS

  2. Sanity check for each batch import

  3. Verification of the imported data

  4. Double-check for duplication and missing metadata

After:

  1. Dry-run on a staging server with the imported data

  2. Data validation and metadata checking

  3. Engineering sign-off

  4. Informing you about the import completion

Comments

You must be logged in to comment in this article.

Login to comment
Swathy

Swathy